| GENERAL GOVERNMENT: Efficiency [Back to Top] |
| 0206 |
Operating Costs for governance and corporate management as a % of total municipal operating costs
|
Operating costs for Governance & Corporate Management
Total Municipal Operating Costs |
$514,929.00
2,420,471.00 |
21.27 |
Total municipal operating costs were spent on Governance & Corp Management |
| PROTECTION SERVICES: FIRE SERVICES Notes [Back to Top] |
| Services contracted from three area departments not located within our township limits. These being the Town of Orangeville Fire Service, the Town of Erin Fire Service and the Grand Valley & Distict Fire Department.
|
| PROTECTION SERVICES: FIRE SERVICES Efficiency [Back to Top] |
| 1103 |
Operating costs for fire services per $1000 of assessment
|
Operating Costs for Fire Services
total property assessment / 1000 |
$147,012.00
442,727.00 |
$0.33 |
per $1,000 of properaty assessment |
| PROTECTION SERVICES: POLICING Notes [Back to Top] |
| Services contracted from Dufferin detachment of the Ontario Provincial Police.
|
| PROTECTION SERVICES: POLICING Efficiency [Back to Top] |
| 1204 |
Operating costs for police services per person
|
Operating Costs for Police Services
Total Population |
240,583.32
2,297.00 |
$104.74 |
Cost per person |
| TRANSPORTATION SERVICES: ROADWAYS Efficiency [Back to Top] |
| 2110 |
Operating costs for unpaved (loose top) roads per lane kilometre
|
Operating costs for Unpaved Roads
Total unpaved lane km |
$350,759.00
257 |
$1,364.82 |
per unpaved lane kilometre |
| TRANSPORTATION SERVICES: ROADWAYS Efficiency [Back to Top] |
| 2111 |
Operating costs for paved (hard top) roads per lane kilometre
|
Operating Costs for Paved Roads
Total paved lane km |
$254,935.00
49 |
$5,202.76 |
per paved lane kilometre |
| TRANSPORTATION SERVICES: ROADWAYS Efficiency [Back to Top] |
| 2130 |
Operating costs/Total Costs for bridges and culverts per square metre of surface area
|
Costs for Bridges & Culverts
Total Square Metres of Surface Area on Bridges and Culverts |
$108,637.00
2,006 |
$54.16 |
per square metre of surface area on bridges and culverts |
| TRANSPORTATION SERVICES: ROADWAYS Efficiency [Back to Top] |
| 2205 |
Operating costs for winter maintenance of roadways per lane kilometre maintained in winter
|
Operating costs for Winter Control
total lane km maintained in winter |
$143,289.00
306 |
$468.26 |
per lane kilometre maintained in winter |
| ENVIRONMENTAL SERVICES: WATER Efficiency [Back to Top] |
| 3311 |
Operating costs for treatment of water per megalitre
|
Operating costs for Treatment of Drinking Water
Total Megalitres of Drinking Water Treated |
$28,681.00
8.1000 |
$3,540.86 |
per megalitre |
| ENVIRONMENTAL SERVICES: WATER Efficiency [Back to Top] |
| 3312 |
Operating costs for the distribution of drinking water per kilometre of water distribution pipe
|
Operating costs for Distribution/Transmission of Drinking Water
total kilometres of water distribution/transmission pipe |
$26,682.00
1.0000 |
$26,682.00 |
per kilometre of water distribution pipe |
| ENVIRONMENTAL SERVICES: WATER Efficiency [Back to Top] |
| 3313 |
Operating costs for treatment & distribution of water per megalitre of water
|
Operating costs for Treatment & Distribution of Drinking Water
Total megalitres of drinking water treated |
$57,363.00
8.1000 |
7,081.85 |
per megalitre |
| ENVIRONMENTAL SERVICES: GARBAGE Notes [Back to Top] |
| The Township has an ongoing contract with Sandhill Disposal for all garbage, recycling and white goods collection and disposal.
|
| ENVIRONMENTAL SERVICES: GARBAGE Efficiency [Back to Top] |
| 3404 |
Operating costs for garbage collection per tonne (or per household)
|
Operating Costs for Garbage Collection
Household |
$57,630.00
919 |
$62.71 |
Per household |
| ENVIRONMENTAL SERVICES: GARBAGE Efficiency [Back to Top] |
| 3504 |
Operating costs for garbage disposal per tonne or per HH
|
Operating Costs for Garbage Disposal
Households |
$37,223.00
919 |
$40.50 |
Per household |
| ENVIRONMENTAL SERVICES: GARBAGE Efficiency [Back to Top] |
| 3606 |
Operatiing costs for solid waste diversion (recycling) per household
|
Operating costs per solid waste diversion (recycling)
Per Household |
$45,775.00
919 |
$49.81 |
Household |
| ENVIRONMENTAL SERVICES: GARBAGE Efficiency [Back to Top] |
| 3607 |
Operating costs for waste management (collection, disposal & diversion) per tonne or per household
|
Operating costs for Solid Waste Management
Households |
$140,628.00
919 |
$153.02 |
Per household |
| PARKS & RECREATION Notes [Back to Top] |
| The Township has a few small subdivision parks with playground equipment and open space areas for use for sports such as soccer but no regulated recreation programs. Our residents register with neighbouring municipal recreation programs and utilize their facilities and we refund any non-resident fees charged for these services. We also give small monetary grants to surrounding townships for the use of their recreation facilities.
|
| PARKS & RECREATION Efficiency [Back to Top] |
| 7103 |
Operating costs for parks per person
|
Operating Costs for Parks
Total Population |
$13,772.41
2,297.00 |
6.00 |
Per Person |
| PARKS & RECREATION Efficiency [Back to Top] |
| 7203 |
Operating Costs for Recreation Programs per person
|
Operating Costs for Recreation Programs
Total Population |
$2,185.00
2,297.00 |
$0.95 |
Per Person |
| PARKS & RECREATION Efficiency [Back to Top] |
| 7306 |
Operating Costs for Recreation Facilities per person
|
Operating Costs for Recreation Facilities
Total Population |
$54,980.00
2,297.00 |
$23.94 |
Per Person |
| PARKS & RECREATION Efficiency [Back to Top] |
| 7320 |
Operating costs/Total costs for recreation programs & facilities per person
|
Costs for Recreation Programs & Facilities
Total Population |
$57,165.00
2,297.00 |
$24.89 |
per Person |
| PARKS & RECREATION Efficiency [Back to Top] |
| 7321 |
Operating Costs for Parks, Recreation Programs & Facilities
|
Operating Costs for Parks, Recreation Programs & Facilities
Total Population |
$70,937.00
2,297.00 |
$30.88 |
Per Person |
| LIBRARY Notes [Back to Top] |
| The Township contracts library services from the Grand Valley Public Library for area residents and reimburses those residents who pay to use the libraries located in the Town of Orangeville.
|
| LIBRARY Efficiency [Back to Top] |
| 7405 |
Operating Costs for Library Services per person
|
Operating Costs for Library Services
Total Population |
$36,934.00
2,297.00 |
$16.08 |
Per Person |
| PROTECTION SERVICES: FIRE SERVICES Notes [Back to Top] |
| Services contracted from three area departments not located within our township limits. These being the Town of Orangeville Fire Service, the Town of Erin Fire Service and the Grand Valley & Distict Fire Department.
|
| PROTECTION SERVICES: FIRE SERVICES Effectiveness [Back to Top] |
| 1151 |
Number of Residential Fire Related Civilian Injuries per 1,000 persons
|
Total Number of Residential Fire Related Civilian Inquires
Total Population/1,000 |
0.00
0.00 |
0.00 |
per 1,000 persons |
| PROTECTION SERVICES: FIRE SERVICES Effectiveness [Back to Top] |
| 1152 |
Number of Residential Fire Related Civilian Injuries averaged over 5 years
|
Total Number of Residential Fire Related Civilian Injuries for (2005+2006+2007+2008+2009)/5
Total Population/1,000 |
0.00
0.000 |
0.00 |
per 1,000 persons |
| PROTECTION SERVICES: FIRE SERVICES Effectiveness [Back to Top] |
| 1155 |
Number of Residential Fire Related Civilian Fatalities per 1,000 persons
|
Total Number of Residential Fire Related Civilian Fatalities
Total Population/1,000 |
0.00
0.000 |
0.00 |
per 1,000 persons |
| PROTECTION SERVICES: FIRE SERVICES Effectiveness [Back to Top] |
| 1156 |
Number of Residential Fire Related Civilian Fatalities averaged over 5 Years per 1,000 Persons
|
Total Number of Residential Fire Related Civilian Fatalities for (2005+2006+2007+2008+2009)/5
Total Population/1,000 |
0.00
0.000 |
0.00 |
per 1,0000 persons |
| PROTECTION SERVICES: FIRE SERVICES Effectiveness [Back to Top] |
| 1160 |
Number of Residential Structural Fires per 1,000 households
|
Total Number of Residential Structural Fires
Total Households/1,000 |
2.00
0.920 |
2.17 |
per 1,000 households |
| PROTECTION SERVICES: POLICING Notes [Back to Top] |
| Services contracted from Dufferin detachment of the Ontario Provincial Police.
|
| PROTECTION SERVICES: POLICING Effectiveness [Back to Top] |
| 1258 |
Violent Crime rate per 1,000 persons
|
Total Number of actual incidents: Violent Crime
Total Population/1,000 |
7.00
2.300 |
3.04 |
Violent crimes per 1,000 persons |
| PROTECTION SERVICES: POLICING Effectiveness [Back to Top] |
| 1259 |
Property Crime rate per 1,000 persons
|
Number of actual incidents: Property Crime
Total Population/1,000 |
44.00
2.30 |
19.13 |
Total incidents per 1,000 persons |
| PROTECTION SERVICES: POLICING Effectiveness [Back to Top] |
| 1262 |
Crime rate for Other Criminal Code crimes (excluding traffic) per 1,000 persons
|
Number of actual incidents of Other Criminal Code crimes (excluding traffic)
Total population/1,000 |
1.00
2.30 |
0.43 |
Total number of Other Criminal Code crimes (excluding traffic) per 1,000 persons |
| PROTECTION SERVICES: POLICING Effectiveness [Back to Top] |
| 1263 |
Total crime rate per 1,000 persons (Criminal Code offences, excl. traffic)
|
Total number of actual incidents of violent crime, property crime & other criminal code offenses (excl. traffic)
Total Population/1,000 |
52.00
2.30 |
22.61 |
Total crimes per 1,000 persons (Criminal Code offences, excl. traffic) |
| PROTECTION SERVICES: POLICING Effectiveness [Back to Top] |
| 1265 |
Number of Youths charged per 1,000 youths
|
Total number of youths cleared by charge or cleared otherwise
Youth population/1,000 |
0.00
201.00 |
0.00 |
Youths crimes per 1,000 youths |
| TRANSPORTATION SERVICES: ROADWAYS Effectiveness [Back to Top] |
| 2152 |
Percentage of paved lane kilometres where the condition is rated as good to very good
|
of lane kilometres tested were rated as good to very good
total number of paved lane kilometres tested |
42
49 |
85.71% |
of lane kilometres tested were rated as good to very good |
| TRANSPORTATION SERVICES: ROADWAYS Effectiveness [Back to Top] |
| 2165 |
Percentage of bridges and culverts where the condition is rated as good to very good
|
Number of bridges & culverts where the condition of primary components is rated as good to very good, requiring only maintenance
Total number of bridges & culverts |
21
21 |
100.00% |
of bridges and culverts were rated in good to very good condition |
| TRANSPORTATION SERVICES: ROADWAYS Effectiveness [Back to Top] |
| 2251 |
Percentage of winter events where the response met or exceeded locally determined road maintenance standards
|
Number of winter event responses met or exceeded municipal road maintenance standards
Total number of winter events |
36
36 |
100.00% |
of winter event responses met or exceeded municipal road maintenance standards |
| ENVIRONMENTAL SERVICES: WATER Effectiveness [Back to Top] |
| 3355 |
Weighted Number of days when a boil water advisory issued by the Medical Officer of Health, applicable to a municipal water supply, was in effect
|
|
|
0 |
weighted days a year boil water advisories were in effect in the service area |
| ENVIRONMENTAL SERVICES: WATER Effectiveness [Back to Top] |
| 3356 |
Number of water main breaks per 100 kilometres of water distribution pipe in a year
|
Number of breaks in water mains in a year
Total kilometres of water main pipe/100 |
0
0.0000 |
0.00 |
Water main breaks per 100 kilometres of water distribution pipe in a year |
| ENVIRONMENTAL SERVICES: GARBAGE Notes [Back to Top] |
| The Township has an ongoing contract with Sandhill Disposal for all garbage, recycling and white goods collection and disposal.
|
| ENVIRONMENTAL SERVICES: GARBAGE Effectiveness [Back to Top] |
| 3452 |
Number of complaints received in a year concerning the collection of garbage & recycled materials per 1,000 households
|
Number of complaints received in a year concerning the collection of garbage and recycled materials
Total Households/1,000 |
3
0.92 |
3.26 |
of complaints received in a year concerning the collection of garbage and recycled materials per 1,000 households |
| ENVIRONMENTAL SERVICES: GARBAGE Effectiveness [Back to Top] |
| 3655 |
Percentage of residential solid waste diverted for recycling
|
Total tons of residential solid waste diverted for recycling
Total tonnes of solid waste & recycling disposed of |
202.82
673.45 |
30.12% |
of residential solid waste diverted for recycling |
| PARKS & RECREATION Notes [Back to Top] |
| The Township has a few small subdivision parks with playground equipment and open space areas for use for sports such as soccer but no regulated recreation programs. Our residents register with neighbouring municipal recreation programs and utilize their facilities and we refund any non-resident fees charged for these services. We also give small monetary grants to surrounding townships for the use of their recreation facilities.
|
| PARKS & RECREATION Effectiveness [Back to Top] |
| 7155 |
Hectares of Open Space per 1,000 persons
|
Total Hectares of Open Space (Municipally Owned)
Total Population/1,000 |
6.07
2.300 |
2.64 |
Hectares of Open Space |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8163 |
Percentage of land designated for agricultural purposes in the Official Plan was not re-designated for other uses during the reporting year
|
Hectares of land designated for agricultural purposes in the Official Plan as of December 31st
Hectares of land designated for agricultural purposes in Official Plan as of January 1st |
12,673.00
12,673.00 |
100.00% |
of land designated for agricultural purposes in the Official Plan was not re-designated for other uses during the reporting year |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8164 |
Percentage of land designated for agricultural purposes which was not re-designated for other uses relative to the base year of 2000
|
Hectares of land designated for agricultural purposes in the Official Plan as of December 31st
Hectares of land designated for agricultural purposes in the Official Plan as of January 1st |
12,673.00
12,841.00 |
98.69 |
of land designated for agricultural purposes was not re-designated for other uses relative to the base year of 2000 |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8165 |
Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses during the reporting year
|
|
|
0.00 |
hectares were re-designated from agricultural purposes to other uses during the reporting year |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8166 |
Number of hectares of land originally designated for agricultural purposes which was re-designated for other uses since January 1st, 2000
|
|
|
0.00 |
hectares were re-designated from agricultural purposes to other uses since January 1st, 2000 |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8167 |
Hectares of land in the settlement area as of December 31st of reporting year
|
|
|
323.90 |
Hectares of land in the settlement area as of December 31st of reporting year |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8168 |
Percentage change in the size of the settlement area relative to the base year of 2004
|
Hectares of land in the settlement area as of December 31, 2010 less the number of hectares of land in the settlement area as of January 4, 2004
Hectares of land in the settlement area as of January 1, 2004 |
0.00
323.90 |
0.00 |
Increase/(decrease) in the size of the settlement area relative to January 1, 2004 |
| PLANNING AND DEVELOPMENT: LAND USE PLANNING Effectiveness [Back to Top] |
| 8170 |
Percentage of New Residential Units located within Settlement Areas
|
Number of New Residential Units Located within Settlement Areas
Total Number of New Residential Units within the Entire Municipality |
0
4 |
0.00% |
of new residential units which are located within settlement areas |
| This document was created on September 28, 2011. |